The project included procurement and construction of new berths 34 and 35 on the east side of new petrochemical quay no. 2, to handle sea going petrochemical tankers from 3,000 to 80,000 dwt. Each berth consistsed of a reinforced concrete loading platform and approach roadway, a low level steel pipe rack, and berthing and breasting dolphins interconnected by tubular steel catwalks, all supported by driven tubular steel piles with cathodic protection.
The loading platform was designed for future construction by others of a hose tower and / or marine loading arms, together with all associated piping, drain tanks and equipment for product handling. Appropriate fixtures and apertures are cast into the main deck for supporting these items in the future.
The berth was complemented by a flexible mooring and fendering system consisting of five breasting dolphins and four mooring dolphins fitted with fenders and quick release hooks.