The project included the construction of DUSUP LNG Receiving Terminal in Jebel Ali Port, containing the connection to onshore grid by 24" underground pipeline installed by horizontal directional drilling.
Photo Gallery
The project included the construction of DUSUP LNG Receiving Terminal in Jebel Ali Port, containing the connection to onshore grid by 24" underground pipeline installed by horizontal directional drilling.
Construction of a Jetty with one Unloading Platform, four breasting dolphins and five Mooring Dolphins. The Island Jetty is built on 102 vertical and raked steel piles. The superstructure is a combination of precast elements and insitu concrete, connected with Walkways and having a small craft landing structure. Cathodic protection was provided for the piles.