• Mobilisation and Demobilization of the equipment and personnel
• Pre-dredging bathymetry and topography
• Removal of underwater obstructions within dredging area (which were known to Contractor at the date of offer submission).
• Dredging of port basin to -34.00 (BD) or - 6.00m from MSL, where MSL or Caspian Mean Level which according to traditional sea map of the Caspian Sea established as -28.00 BD
• Material arising from the dredging operations is directly placed in the allocated disposal area onshore at a distance of approximately 2.0 km from the dredging area.
• Intermediate and post-construction surveys (for quantities calculation and quality control).
• Demobilisation of the dredging equipment, auxiliaries and personnel.