Project Description The project included the construction of 3 berths to handle seagoing tankers ranging from 3,000 dwt to 80,000 dwt.
The main items of work comprised :
- a loading platform
- 5 nos. breasting dolphins
- 4 nos. mooring dolphins
- an access trestle
- 6 nos. catwalks all supported on tubular steel piles, concrete works and associated structural steel together with wharf fittings.
The mechanical works include
- HVAC
- firewater system
- potable water system
- slop water systems
- substation
- cables
- switchgear
- lighting and navigational aids
Also includes
- roads
- pavings
- culverts
- building works
Construction From: 11/2006
Construction To: 03/2009
Contract Amount (IN "000" US$): 50,667
Archirodon Portion: 25,333 (50%)
Owner: Royal Commission for Jubail and Yanbu Directorate General for Jubail Projects