The Project includes the design (Civil and MEP) and construction of 7.2 km metro line including 3 no. elevated metro stations, namely Qatar Economic Zone, Barwa and Al Wakra North Stations.
Photo Gallery
The Project includes the design (Civil and MEP) and construction of 7.2 km metro line including 3 no. elevated metro stations, namely Qatar Economic Zone, Barwa and Al Wakra North Stations.
• Demolition of existing buildings affecting the Permanent Works - Site Clearance
• Temporary Traffic Diversion works
• Utility Diversion works
• Surveys and Geotechnical Investigations
• 5660m Viaduct double(or triple)-track on piers incl. short ramps and at-grade sections
• 843m & 865m viaduct single-track on piers for Depot Branch-off North (Turn-In) & Depot Branch-off South (Turn-Out) respectively
• Highway Works - 1080m of Road Underpass-Cut & Cover
• 3 Stations:
- Qatar Economic Zone Station (Elevated)
- Barwa Station (Elevated & At-Grade)
- Al Wakra North (Elevated)
• Depot Grading Works